The first track weekend of the year saw dry but rather cold conditions on site.

A very good turn out of volunteers on Friday, Saturday and Sunday saw a number of jobs undertaken. The main focus was work on the second track in the cutting down to the tunnel, with excellent progress being made. All the materials unloaded last weekend were used up and several more panels of track are now complete.

Work continued on the point rodding runs with the benches for the angle cranks set up. These are composed of two large concrete blocks and two hardwood sleepers, so everything is very heavy. Lots of huffing and puffing was required to finalize the location of the bench, but it is there now.

Elsewhere the railbus received some work to the air system and an ‘A’ exam.

Joe was up working on a gate for the platform and potting…

View original post 61 more words

Advertisements

About maxstafford60093

Scotsman in exile. Lover of Scotland's railways, land, people and culture. Always got an ear for new and interesting music. Politically of the left and most definitely repelled by the shallow and narcissistic. An unlikely jazz-cat mod rocker with punk tendencies; a bit 1968, a bit 1977 with a distracting overdub of 1958... Most often found outdoors with my four legged buddy!
Gallery | This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s