One project that has been bubbling away at the back for a while is this LMS Diagram 1790 Period 2 Brake 3rd.
It started life as one of those bargain Dapol knocked-down kits that in my opinion offer some of the best kit-basher material around.
Modifications include replacement of the bogies with Bachmann version which were easily re-wheeled with EM sets.
Comet cast underframe parts replaced the old 1970s vintage mouldings, the sides have been drilled out to receive grab rails and the vent holes in the roof have been filled pending re-drilling so the torpedo vents can be mounted in the correct configuration.
Once painting has been completed and the interior suitably decorated, I intend to add the Shawplan glazing.
It’s a tribute to the excellence of the original Airfix tooling that this model still scrubs up well the better part of 40 years after introduction!
Leave a Reply